In this episode of the Trans Am project, Mark prepares to install new sheet metal in the floor by cutting out what remains of the original floorboards all the way up to the transmission tunnel. With the new floor in place, he seam seals the edges and applies a coat of bedliner to the underside to protect the new metal from stone damage in the future.